1 de 1

Siemens 6GK5216-4GS00-2AC2 SCALANCE XC216-4C G Managed Layer 2 IE Switch

Siemens 6GK5216-4GS00-2AC2 SCALANCE XC216-4C G Managed Layer 2 IE Switch

Il ne reste que 3 article(s) en stock
  • Fabricant : Siemens

  • N° de produit : 6GK5216-4GS00-2AC2

  • Pays d'origine :Allemagne

  • Type de produit : Managed Industrial Ethernet Switch

  • Code-barres : 85176200

  • Paiement : Virement bancaire, Western Union

  • Poids : 520g

  • Dimensions : 20 x 15 x 10 cm

  • Port d'expédition : Xiamen

  • Garantie : 12 mois

Quantité
Voir les détails complets

Description

The Siemens 6GK5216-4GS00-2AC2 is a SCALANCE XC216-4C G managed Layer 2 Industrial Ethernet switch designed for robust performance in demanding automation environments. This full Gigabit switch provides a high-density port configuration with 12 RJ45 ports and 4 flexible combo ports, suitable for either SFP fiber optic or copper RJ45 connections. It supports critical industrial protocols like PROFINET IO and is Ethernet/IP compliant, ensuring seamless integration into modern control systems. With features such as a redundant power supply, an extended operating temperature range, and a slot for a C-PLUG configuration memory module, this switch is engineered for high network availability and simplified device replacement.

Features

  • Full Gigabit performance across all ports for high-speed data transfer.
  • Managed Layer 2 switching with office features including RSTP and VLANs.
  • PROFINET IO device functionality for integration into Siemens automation networks.
  • Ethernet/IP compliant for interoperability with Rockwell/Allen-Bradley systems.
  • Extended operating temperature range from -40 to +70 degC.
  • Redundant power supply input for increased operational reliability.
  • C-PLUG slot for easy device replacement without reprogramming.
  • Certified to IEC 62443-4-2 for industrial network security.
  • Onboard diagnostics LED for at-a-glance status monitoring.

Applications

  • Factory automation and plant-floor control networks.
  • Process control systems requiring high network availability.
  • Infrastructure projects such as traffic control and utility management.
  • Machine-to-machine (M2M) communication links.
  • Applications in harsh environments with wide temperature fluctuations.

Technical Specifications

Specification Value
Manufacturer Siemens
Product Series SCALANCE
Model XC216-4C G
Part Number 6GK5216-4GS00-2AC2
Product Type Managed Layer 2 Industrial Ethernet Switch
RJ45 Ports 12 x 10/100/1000 Mbps
Combo Ports 4 x 1000 Mbps (configurable as SFP or RJ45)
Console Port 1
Industrial Protocols PROFINET IO Device, Ethernet/IP Compliant
Power Supply Redundant Input
Operating Temperature -40 to +70 degC
Mounting Options DIN Rail, S7 Mounting Rail, Wall Mount
Security Certification IEC 62443-4-2
Shipping Weight 0.52 kg
Commodity Code 85176200
ECCN EAR99
Country of Origin Germany (Estimate)
Package Dimensions (Calculated) 20 x 15 x 10 cm

Installation Guidelines

CRITICAL WARNING: Electrical Hazard. Installation must be performed by qualified personnel only. De-energize all power sources and follow Lockout/Tagout (LOTO) procedures before commencing any installation or maintenance tasks. Failure to comply can result in severe injury or death.
  1. 1 De-energize the control cabinet and verify the absence of voltage before handling the device.
  2. 2 Securely mount the switch onto a standard DIN rail, S7 rail, or a flat panel/wall surface using the appropriate mounting points. Ensure adequate clearance for ventilation and cable access.
  3. 3 Connect a low-impedance protective earth (PE) conductor to the designated grounding terminal on the switch chassis. This is essential for safety and EMC performance.
  4. 4 Connect the primary and, if used, redundant DC power supply lines to the power input terminals, observing correct polarity.
  5. 5 Terminate shielded Ethernet cables to the RJ45 ports. Ensure proper shield grounding at the cable gland or connector backshell to minimize noise interference.
  6. 6 If using fiber optic connections, insert the appropriate SFP transceivers into the combo port cages before connecting fiber optic patch cords.
  7. 7 Insert a C-PLUG memory module (if available) into the designated slot to enable automatic configuration backup and restore.
  8. 8 After all connections are secure, re-energize the cabinet and verify the status LEDs on the switch for power, link activity, and fault indications.

Expédition express mondiale

  • Livraison standard : 4 à 6 jours ouvrables via DHL, FedEx et UPS.
  • Expédition express : Expédition le jour même pour les commandes en stock passées avant 14h00 (GMT+8).
  • Couverture mondiale : Service dans plus de 150 pays, avec livraison rapide en Arabie Saoudite et aux Émirats arabes unis.

Retours et garantie

  • Garantie de 30 jours : Retours acceptés pour les produits en stock dans leur emballage d’origine scellé en usine.
  • Garantie de 12 mois : Chaque composant industriel est couvert par notre garantie technique professionnelle.

Les commandes sont traitées et livrées du lundi au vendredi (hors jours fériés).


Pour connaître les conditions d’éligibilité complètes, les frais de restockage et les détails des retours internationaux, veuillez consulter notre site officiel Politique de remboursement et de retour .

TECHNICAL SPECIFICATIONS

Country of origin
Allemagne

Produits récemment consultés

Connaissances techniques

Logique booléenne en programmation PLC : comprendre les portes logiques FBD

La logique booléenne est la base de tout programme PLC. Des commandes machines simples aux systèmes d'automatisation industrielle complexes, les portes logiques déterminent comment les contrôleurs...

Guide approfondi sur les pare-feux industriels et la segmentation des réseaux OT

Les pare-feux industriels jouent un rôle crucial dans la cybersécurité OT, protégeant les réseaux PLC, DCS et SCADA grâce à la segmentation, au contrôle des entrées/sorties et à l'intégration IDS/IPS...

Guide des préhenseurs robotiques : de la manipulation délicate à l'automatisation lourde

Les pinces robotiques modernes évoluent au-delà des mâchoires mécaniques traditionnelles. Des systèmes adhésifs inspirés du gecko et des pinces souples de qualité alimentaire aux outils d'entrepôt...

Retour en arrière : comment les premiers moteurs électriques ont transformé l'exploitation minière souterraine

Des compresseurs à courant continu entraînés par corde aux wagonnets de mine alimentés par batterie, les premières opérations minières ont marqué un tournant dans l’électrification industrielle. Cet...

Factory I/O : un outil moderne de simulation PLC pour la formation à l'automatisation industrielle

Factory I/O révolutionne l'enseignement des automates programmables industriels (API) en proposant des simulations industrielles 3D immersives pour les étudiants, les ingénieurs et les équipes de...

Programmation des cycles de mouvement à axe unique sur un servo-variateur CMZ

Ce tutoriel examine comment la fonctionnalité PLC intégrée dans un servo-variateur CMZ SBD peut exécuter des programmes de mouvement autonomes, y compris la logique de référencement, le contrôle de...