1 / 1

LJ71GF11-T2-CM Mitsubishi CC-Link IE Field Master Local Module MELSEC-L

LJ71GF11-T2-CM Mitsubishi CC-Link IE Field Master Local Module MELSEC-L

Only 10 item(s) left in stock
  • Manufacturer: Mitsubishi Electric

  • Product No.: LJ71GF11-T2-CM

  • Country of origin:Egyesült Államok

  • Product Type: Field Master Local Module

  • Payment: T/T, Western Union

  • Weight: 270g

  • Dimensions: 90 x 28.5 x 116.5 mm

  • Shipping port: Xiamen

  • Warranty: 12 months

Mennyiség
Minden részlet megtekintése

Product Overview

The Mitsubishi LJ71GF11-T2-CM (LJ71GF11T2CM) is a high-capacity CC-Link IE Field Network master/local station module designed specifically for the MELSEC-L Series PLC. Operating at a blistering 1 Gbps communication speed, this module integrates field devices, remote I/O, and other controllers into a seamless, high-speed Ethernet-based network. Optimized for data-intensive industries such as liquid crystal display (LCD) manufacturing, high-speed packaging, and complex food processing, the LJ71GF11-T2-CM provides the massive bandwidth required for real-time motion control and large-scale diagnostic data collection. By utilizing standard Category 5e (or higher) double-shielded cables, it offers a cost-effective yet industrial-grade solution for reducing network latency and maximizing total system throughput.

Technical Configuration

The LJ71GF11-T2-CM is a versatile communication hub that can be configured either as a "Master Station" to manage a network or as a "Local Station" to exchange data with other masters. It supports a staggering 16,384 points of remote I/O and 8,192 words of remote registers, allowing it to handle extremely complex field configurations without performance degradation.

The module features a 1 Gbps transmission rate using standard Ethernet physical layers (1000BASE-T). It supports flexible network topologies including line, star, and ring configurations. In a ring topology, the module provides enhanced reliability through a loop-back function, ensuring the network remains operational even if a single cable is disconnected. Note that this module requires a MELSEC-L CPU with a serial number prefix of "13012" or later to utilize its full high-speed functional range.

Technical Specifications

Feature Specification
Model LJ71GF11-T2-CM
Brand Mitsubishi Electric
Network Type CC-Link IE Field Network
Station Type Master or Local Station
Communication Speed 1 Gbps
Remote I/O Capacity 16,384 Points
Remote Register 8,192 Words
Network Topology Line, Star, Ring
Max. Stations 121 (including Master)
Internal Current (5 VDC) 0.89 A
Weight 0.27 kg
Dimensions 90 x 28.5 x 116.5 mm

Technical FAQs

Q1: What is the significance of the "CM" suffix in this model number?

A1: The "CM" suffix typically denotes the "Chinese Market" or specific regional compliance version, which may include localized documentation or specific environmental certifications while maintaining identical technical performance to the standard LJ71GF11-T2.

Q2: How do I implement a Ring Topology with this module?

A2: To utilize a ring topology, connect the cables in a continuous loop and configure the "Network Topology" setting to "Ring" within the GX Works2 parameter settings. This enables the loop-back function for redundant communication paths.

Q3: Why is my module not recognized by the L-Series CPU?

A3: Ensure your CPU's serial number starts with "13012" or later. Older CPU revisions do not have the internal bus logic required to communicate with the high-speed CC-Link IE Field hardware.


Engineering & Installation Guide

  • Cable Selection: Only use Category 5e or higher STP (Shielded Twisted Pair) cables that are specifically rated for 1000BASE-T. For industrial environments with high EMI (Electromagnetic Interference), double-shielded cables are highly recommended to prevent packet loss at 1 Gbps speeds.

  • Redundancy Planning: If using a star topology, the network requires an industrial-grade switching hub that supports 1 Gbps. For mission-critical applications, the ring topology is preferred as it eliminates the switching hub as a single point of failure.

  • Heat Dissipation: The LJ71GF11-T2-CM consumes 0.89 A of internal current, which is relatively high for an L-Series module. Ensure that the total current consumption of all modules on the branch does not exceed the power supply unit's (PSU) capacity, and maintain proper ventilation gaps in the control cabinet.

Globális expressz szállítás

  • Normál szállítás: 4-6 munkanap a DHL, FedEx és UPS szolgáltatásával.
  • Gyors kiszállítás: A raktáron lévő, 14:00 (GMT+8) előtt leadott megrendeléseket aznap feladjuk.
  • Világszintű lefedettség: Több mint 150 országban szolgálunk ki, beleértve a gyors szállítást Szaúd-Arábiába és az Egyesült Arab Emírségekbe.

Visszaküldés és garancia

  • 30 napos garancia: Csak a raktáron lévő termékek eredeti, gyári zárt csomagolásban történő visszaküldését fogadjuk el.
  • 12 hónapos garancia: Minden ipari alkatrészünket szakmai műszaki garancia védi.

A megrendeléseket hétfőtől péntekig dolgozzuk fel és szállítjuk (állami ünnepnapok kivételével).


A teljes jogosultság, a készletfeltöltési díjak és a nemzetközi visszaküldési részletek megtekintéséhez kérjük, tekintse meg hivatalos oldalunkat Visszatérítési és Visszaküldési Szabályzat .

TECHNICAL SPECIFICATIONS

Color pattern
Szürkésfehér
Country of origin
Egyesült Államok
Power source
DC áram

Nemrég megtekintett termékek

Műszaki ismeretek

Elektromos működtetők, amelyek a folyadékenergia-rendszereket váltják ki: Gyakorlati ipari automatizálási útmutató

Ez a cikk bemutatja, hogyan alakítják át az integrált elektromos működtetők, például az SMC e-Actuator sorozata, az ipari mozgásvezérlést azáltal, hogy kiváltják a hagyományos pneumatikus és...

Matematikai műveletek OpenPLC-vel ipari automatizálási alkalmazásokhoz

Ez a cikk bemutatja, hogyan hajtanak végre a PLC rendszerek alapvető matematikai műveleteket, mint az összeadás, kivonás, szorzás, osztás, modulo és hatványozás az ipari automatizálásban. Megmutatja,...

Fejlett Boole-logika FBD PLC programozással: Gyakorlati ipari alkalmazások a alapvető logikán túl

A cikk több fejlett Boole-logikai függvényt ismertet, amelyeket a PLC programozásban használnak az alapvető ÉS, VAGY és NEM műveleteken túl. Bemutatja, hogyan alkalmazhatók olyan eszközök, mint az...

Boole-logika a PLC programozásban: Az FBD logikai kapuk megértése

A Boole-logika minden PLC program alapja. Az egyszerű gépvezérlésektől a bonyolult ipari automatizálási rendszerekig a logikai kapuk határozzák meg, hogyan reagálnak a vezérlők a változó bemenetekre...

Részletes útmutató az ipari tűzfalakról és az OT hálózati szegmentációról

Az ipari tűzfalak kulcsfontosságú szerepet játszanak az OT kiberbiztonságban, védve a PLC, DCS és SCADA hálózatokat szegmentálás, be- és kimeneti forgalom szabályozás, valamint az IEC 62443 elveivel...

Útmutató a robotikus fogókhoz: a finomkezeléstől a nehézüzemi automatizálásig

A modern robotfogók túlmutatnak a hagyományos mechanikus állkapcsokon. A gyíkok tapadó rendszerétől és az élelmiszeripari puha fogóktól az MI-vezérelt raktári eszközökig a fejlett fogástechnológiák...