1 dari 1

Beckhoff IP2020-B200 Fieldbus Box

Beckhoff IP2020-B200 Fieldbus Box

Hanya 10 item tersisa di stok
  • Produsen: BECKHOFF

  • Nomor Produk: IP2020-B200

  • Negara asal:Jerman

  • Jenis Produk: Fieldbus Box Modules

  • Pembayaran: T/T, Western Union

  • Berat: 500g

  • Pelabuhan pengiriman: Xiamen

  • Garansi: 12 bulan

Jumlah
Lihat detail lengkap

Description

Designed for noise-immune distributed industrial automation, the Beckhoff IP2020-B200 establishes robust control node links through a high-speed optical fiber interface. Operating as a decentralized Fieldbus Box, this module integrates seamlessly into Lightbus ring topologies to offer rapid data transmission speeds of 2.5 Mbaud over optical fiber lines. Its design provides native galvanic isolation and absolute immunity to electromagnetic interference (EMI), making it optimal for heavy-duty manufacturing zones. The module utilizes standardized M8 connection interfaces for control power routing and features specialized fiber-optic sockets configured for direct-plug compatibility.

Features

  • High-Speed Lightbus Interface: Operates at a constant 2.5 Mbaud rate for deterministic control cycles.
  • Immunity to Electrical Noise: Utilizes dual fiber-optic connections for total electrical isolation between control logic and the field network.
  • Configurable Field Parameters: Supports full configuration through Beckhoff KS2000 commissioning software or directly via the master PLC program.
  • Flexible Auxiliary Power Routing: Separate control voltage and load voltage circuits mapped across dedicated 4-pin M8 sockets.
  • Robust Environmental Protection: Sealed IP67-rated housing supports cabinet-free installation directly on machinery.

Applications

  • Automotive Assembly Lines: High-EMI welding environments requiring secure, non-conductive data transfer.
  • Packaging and Material Handling: Distributed topologies with high mechanical vibration and long cable runs.
  • Hazardous/Corrosive Areas: Applications where optical isolation prevents ground loops and spark hazards.

Technical Specifications

Parameter Specification Value
Manufacturer Beckhoff
Model Designation IP2020-B200
Bus Interface 2 x fiber-optic socket for plug ZS1020-0010
Data Transfer Rate 2.5 Mbaud
Control Supply Voltage 24 V DC (-15% / +20%)
Power Feed Connector 1 x M8 male socket, 4-pin
Downstream Power Connector 1 x M8 female socket, 4-pin
Electrical Isolation Control voltage to fieldbus: Yes
Operating Temperature 0 degC to 55 degC
Storage Temperature -25 degC to 85 degC
Ingress Protection Rating IP65 / IP66 / IP67 (conforms to EN 60529)
Vibration Resistance Conforms to EN 60068-2-6
Shock Resistance Conforms to EN 60068-2-27
Standards & Approvals CE, UL
Net Weight Approx. 250 g
Shipping Weight (Calculated) 0.55 kg (including packaging material)

Connections and Interfaces

M8 Terminal Pin Circuit Assignment Functional Description
Pin 1 +24 V DC Us Control supply voltage for internal electronics
Pin 2 +24 V DC Up Auxiliary/load supply voltage for sensors/actuators
Pin 3 GND Us Reference ground for control electronics
Pin 4 GND Up Reference ground for sensor/actuator power circuits

Empirical Engineering Insights

Alternative Models & Compatibility

The IP2020-B200 relies on the standard Beckhoff Lightbus protocol (II2001 or FC2001 PCI cards). If migrating to EtherCAT-based infrastructure, consider transitioning to the EP-series Fieldbus Boxes (e.g., EP1111 or EP2028-0002). For maintenance of older optical rings, keep spare ZS1020-0010 plastic optical fiber plugs on hand, as connection alignment is critical to maintaining signal budget across consecutive nodes.

Application Pitfalls & Engineering Notes

Plastic optical fibers (POF) must be cut perfectly perpendicular using a dedicated optical fiber cutter (such as Beckhoff ZS1023-0003). Ragged or angled cuts lead to high optical attenuation, triggering intermitted packet drops and system fault codes on the master controller. Maintain a minimum bend radius of 25 mm for the optical fiber to avoid permanent stress damage to the physical core.

Commissioning & Wiring Tips

When configuring node addresses via KS2000, ensure your PC-to-node interface baud rate is set to match the hardware default. When checking the optical power level budget, use the diagnostic register status flags inside the PLC control word to verify the optical link quality before putting the system into high-demand operation.

Installation Guidelines

CRITICAL WARNING: De-energize all primary and auxiliary power systems (Us and Up) before inserting or removing the M8 connectors or optical fiber connections. Failure to do so can cause voltage spikes on signal pins or physical contamination of open optical sockets, resulting in permanent optical link degradation.
1

Mount the IP2020-B200 securely to a flat, rigid panel surface or machine frame using M4 industrial mounting bolts. Do not apply mechanical tension to the housing.

2

Insert the fiber-optic plugs (ZS1020-0010) into the dedicated optical ports. Ensure they seat firmly and the retention sleeve clicks or secures tightly.

3

Connect the 4-pin M8 auxiliary power cables to the male input port. Torque the M8 threaded connector ring to 0.4 Nm to guarantee the IP67 moisture seal.

4

If running downstream modules, extend power out of the female M8 port using industrial shielded cabling. Seal any unused ports with protective IP67 plastic caps.

Loading product navigation…

What is the primary function of the Beckhoff IP2020-B200?

It acts as a distributed Fieldbus Box node that interfaces field signals with a Lightbus master system via a high-speed fiber-optic connection running at 2.5 Mbaud.

What connectors are used for power transmission on this module?

It features a 4-pin M8 male socket for power feed-in and a 4-pin M8 female socket for daisy-chaining auxiliary and control voltages to downstream modules.

Does the IP2020-B200 require a special optical plug?

Yes, it uses the ZS1020-0010 plastic optical fiber plug specifically configured for Beckhoff Lightbus communication ports.

How do you configure the parameters of this Fieldbus Box?

Configuration parameters can be modified through the Beckhoff KS2000 software suite or mapped through software register commands directly via the controller.

Pengiriman Ekspres Global

  • Pengiriman Standar: 4-6 Hari Kerja melalui DHL, FedEx, dan UPS.
  • Pengiriman Ekspres: Pengiriman pada hari yang sama untuk pesanan dalam stok yang dilakukan sebelum pukul 14:00 (GMT+8).
  • Cakupan Seluruh Dunia: Melayani lebih dari 150 negara, termasuk pengiriman cepat ke Arab Saudi dan UAE.

Pengembalian & Garansi

  • Jaminan 30 Hari: Pengembalian diterima untuk produk yang tersedia dalam stok dengan kemasan asli yang tersegel pabrik.
  • Garansi 12 Bulan: Setiap komponen industri didukung oleh garansi teknis profesional kami.

Pesanan diproses dan dikirimkan Senin-Jumat (tidak termasuk hari libur nasional).


Untuk kelayakan penuh, biaya pengisian ulang, dan detail pengembalian internasional, silakan lihat resmi kami Kebijakan Pengembalian & Pengembalian Dana .

TECHNICAL SPECIFICATIONS

Country of origin
Jerman

Produk yang Baru Dilihat

Pengetahuan teknis

Aktuator Listrik yang Dirancang untuk Menggantikan Sistem Tenaga Fluida: Panduan Praktis Otomasi Industri

Artikel ini menjelaskan bagaimana aktuator listrik terintegrasi, seperti seri e-Actuator dari SMC, mengubah kontrol gerak industri dengan menggantikan sistem pneumatik dan hidrolik tradisional....

Operasi Matematika Menggunakan OpenPLC untuk Aplikasi Otomasi Industri

Artikel ini menjelaskan bagaimana sistem PLC melakukan operasi matematika inti seperti penjumlahan, pengurangan, perkalian, pembagian, modulo, dan perpangkatan dalam otomasi industri. Artikel ini...

Logika Boolean Lanjutan dengan Pemrograman FBD PLC: Aplikasi Industri Praktis di Luar Logika Dasar

Artikel ini menjelaskan beberapa fungsi logika Boolean lanjutan yang digunakan dalam pemrograman PLC selain operasi dasar AND, OR, dan NOT. Artikel ini membahas bagaimana alat seperti tabel...

Logika Boolean dalam Pemrograman PLC: Memahami Gerbang Logika FBD

Logika Boolean adalah dasar dari setiap program PLC. Dari kontrol mesin sederhana hingga sistem otomasi industri yang kompleks, gerbang logika menentukan bagaimana pengendali merespons perubahan...

Panduan Mendalam tentang Firewall Industri dan Segmentasi Jaringan OT

Firewall industri memainkan peran penting dalam keamanan siber OT, melindungi jaringan PLC, DCS, dan SCADA melalui segmentasi, kontrol masuk/keluar, dan integrasi IDS/IPS yang sesuai dengan prinsip...

Panduan Gripper Robotik: Dari Penanganan Halus hingga Otomasi Berat

Gripper robot modern berkembang melampaui rahang mekanis tradisional. Mulai dari sistem adhesif yang terinspirasi oleh cicak dan gripper lembut yang aman untuk makanan hingga alat gudang bertenaga...