General Electric

GE IS215WEMAH1B Mark VIe Wind Energy Main Converter Control

SKU IS215WEMAH1B

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: General Electric

  • Product No.: IS215WEMAH1B

  • Country of origin:United States

  • Product Type: Wind Energy Main Cabinet Board

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 520g

  • Dimensions: 26cm x 15.2cm x 3cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The IS215WEMAH1B serves as a specialized processing node engineered exclusively for the main power converter sub-assemblies of alternative energy wind turbines. This Wind Energy Main Converter Control board operates within the structured environment of the Mark VIe Speedtronic hardware framework, handling localized electrical variables, thermal processing points, and high-capacity digital inputs required for real-time turbine control loops. The assembly utilizes an integrated SCOM grounding output line to establish proper ground integrity under fluctuating high-voltage wind generation conditions. To ensure reliable performance when exposed to harsh wind farm elements, the IS215WEMAH1B converter control board is built as a domestic special-assembly module utilizing protective layer coatings over its discrete analog and digital component pathways.

Features

  • Special-assembly configuration incorporating a dedicated SCOM grounding output line.
  • Four high-capacity onboard fuses designed for localized surface voltage protection.
  • Eight physical relays grouped in a clustered layout along the upper left corner of the substrate.
  • Discrete passive component layout utilizing protective resistors, capacitors, and factory-labeled "223 Coilcraft D" inductors.
  • Centralized reinforcement structure featuring four metal standoffs to provide extra mechanical stability for larger board profiles.
  • Conformal-coated base circuitry for operational stability in high-moisture or dusty turbine nacelle environments.

Applications

  • Wind turbine main converter sub-assembly management
  • Alternative energy automated drive monitoring networks
  • Industrial temperature and relay switching loops within Mark VIe topologies

Technical Specifications

Parameter Specification
Manufacturer GE Energy
Series Mark VI Speedtronic (Mark VIe Series Group 1)
Functional Acronym WEMA
Part Number IS215WEMAH1B
Functional Description Wind Energy Main Converter Control
Functional Revision B
Total Digital Inputs 27 channels
Analog Inputs 2 thermistor temperature sensor inputs
Total Inputs 29 channels
Relay Contact Outputs 9 channels
Solid-State Relay Outputs 3 channels
Circuit Protections 4 surface voltage fuses
PCB Coating Conformal Coating
Manufacturing Origin USA

Connections/Interfaces

Interface Port Description / Function
J7 Connector Localized board communication and interface port
P2 Connector Signal processing input/output pathway
P5 Connector Auxiliary voltage/signal interface port
Transformer Interface Top right corner transformer connection for local power conversion
SCOM Line Specialized grounding output line connection

Installation Guidelines

  • Mechanical Positioning: Use the factory-drilled holes along the edges of the board for secure attachment inside the control cabinet enclosure. Ensure all four central metal standoffs are aligned properly to support the board weight.
  • Grounding Connection: Confirm that the specialized SCOM grounding output line is correctly terminated according to the guidelines outlined in the GEH-6721 System Guide.
  • Fuse Inspection: Verify that all four surface voltage fuses are intact and properly seated in their respective holders before applying power to the main converter circuit.
  • Cable Strain Relief: Use appropriate strain relief routing when connecting wiring harnesses to the J7, P5, and P2 connector ports to prevent stress on the board solder points.

FAQ

What does the special assembly designation indicate for this control board?

The 'IS215' special assembly tag confirms that the physical hardware assembly includes a dedicated SCOM grounding output line for structural ground verification.

What is the total combined channel count for input and output lines?

The module contains 29 total inputs (27 digital inputs and 2 analog thermistor inputs) and 12 total outputs (9 relay contact outputs and 3 solid-state relay outputs).

Can this control board be utilized within standard steam or gas turbine applications?

No. The module is a WEMA-acronym device specifically engineered and restricted for use in the main power converter control loops of compatible wind turbine generation systems.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 2 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Green
Country of origin
United States

Technical knowledge

Troubleshooting Beckhoff EPP2008-0001 Output Faults

A field checklist for EPP2008-0001 current limits, supply voltage, channel LEDs, connector coding and load-related output faults.

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.

ABB PM891K01 Replacement: Check Redundancy Before Ordering

ABB PM891K01 article 3BSE053241R1 is the non-redundant AC 800M processor kit. Use this field checklist before replacement.

ABB TP853 Replacement Checks for CI853/CI855/CI857/CI861

Replacement checks for ABB TP853 3BSE018126R1: identify the installed CI853, CI855, CI857, or CI861 interface, record wiring, and verify communication after installation.