General Electric

General Electric IS200TBCIS2C Mark VI Speedtronic Contact Input Termination Board

SKU IS200TBCIS2C

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: General Electric

  • Product No.: IS200TBCIS2C

  • Country of origin:United States

  • Product Type: Contact Input Termination Board

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 780g

  • Dimensions: 28.0 cm x 11.5 cm x 4.8 cm (W x H x D)

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The IS200TBCIS2C is a contact input termination board engineered for the Mark VI Speedtronic turbine control system assembly. This board is designed to interface field dry contact wiring with core system control cards, accepting 24 total dry contact inputs. The contact input voltage loop is powered by a floating power supply within the turbine control infrastructure. To prevent electrical disturbance, each dry contact channel is optically isolated and sampled at system frame rate for precise control action. The board facilitates signal fanning, distributing the input voltage status to three separate VME board racks via three dedicated interface connectors. It is built as a domestic hardware assembly featuring an S-style protective PCB coating, providing cross-system compatibility with VCCC and single-slot VCRC contact input cards.

Features

  • Processes up to 24 discrete dry contact inputs powered via a floating supply.
  • Optically isolated input loops protect core processor racks from field surges.
  • Real-time contact status acquisition running synchronously at system frame rate.
  • Fans out digital input indicators to three separate VME control racks concurrently.
  • Outfitted with integrated noise suppression filters across six primary field contact paths.
  • Protected by an S-style conformal PCB coating layer for insulation in harsh processing spaces.

Applications

  • Gas and steam turbine discrete contact execution
  • Sequential control logic and interlocking systems
  • Generator control field trip and alarm routing
  • Distributed automation loop diagnostics

Technical Specifications

Parameter Value
Original Manufacturer GE Industrial Systems
Part Number IS200TBCIS2C
Series Mark VI Speedtronic
Functional Acronym TBCI
Functional Description Contact Input Termination Board
Total Inputs 24 dry contact inputs
Signal Fanning Up to 3 VME board racks
PCB Coating S-style PCB coating
Primary Functional Revision A

 

Connections/Interfaces

Connector Label Function
JR1 Interfaces with the J3 connection point on the first VCCC/VCRC card rack
JS1 Interfaces with the J3 connection point on the second VCCC/VCRC card rack
JT1 Interfaces with the J3 connection point on the third VCCC/VCRC card rack

 

Installation Guidelines

  • Disconnect all electrical energy going into the target cabinet before placing or terminating the field interface device.
  • Mount the board using the correct standoffs or DIN infrastructure matching the Mark VI enclosure layout.
  • Wire the 24 field dry contact inputs using the standard terminal blocks, ensuring signal pairs align correctly with the floating power supply routing.
  • Fasten the JR1, JS1, and JT1 ribbon interface cables between the board and the respective VCCC or VCRC cards, ensuring connector tabs lock securely.

FAQ

What configuration of input signals does the board support?

The board accepts up to 24 total dry contact inputs that draw electrical power from a floating supply in the turbine control system enclosure.

How are the field signals protected from high-frequency noise?

Each input channel is optically isolated and sampled at frame rate, while six field contacts are equipped with dedicated noise suppression filters to minimize signal interference.

Which interface modules are compatible with this termination board?

The module interfaces with three J3 plugs on either a VCCC Contact Input Board or a single-slot VCRC alternative module through its onboard JR1, JS1, and JT1 connectors.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 8 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Green
Country of origin
United States
Power source
DC Power

Technical knowledge

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.

ABB PM891K01 Replacement: Check Redundancy Before Ordering

ABB PM891K01 article 3BSE053241R1 is the non-redundant AC 800M processor kit. Use this field checklist before replacement.

ABB TP853 Replacement Checks for CI853/CI855/CI857/CI861

Replacement checks for ABB TP853 3BSE018126R1: identify the installed CI853, CI855, CI857, or CI861 interface, record wiring, and verify communication after installation.

5069-L330ERMS2 Startup Checks: RTBs, I/O, and Motion Limits

Engineering checks for the Allen-Bradley 5069-L330ERMS2: controller capacity, separate RTB kits, local I/O limits, network-node limits, and motion-axis count.