1 จาก 1

LJ71GF11-T2-CM Mitsubishi CC-Link IE Field Master Local Module MELSEC-L

LJ71GF11-T2-CM Mitsubishi CC-Link IE Field Master Local Module MELSEC-L

Only 10 item(s) left in stock
  • Manufacturer: Mitsubishi Electric

  • Product No.: LJ71GF11-T2-CM

  • Country of origin:สหรัฐอเมริกา

  • Product Type: Field Master Local Module

  • Payment: T/T, Western Union

  • Weight: 270g

  • Dimensions: 90 x 28.5 x 116.5 mm

  • Shipping port: Xiamen

  • Warranty: 12 months

ปริมาณ
ดูรายละเอียดทั้งหมด

Product Overview

The Mitsubishi LJ71GF11-T2-CM (LJ71GF11T2CM) is a high-capacity CC-Link IE Field Network master/local station module designed specifically for the MELSEC-L Series PLC. Operating at a blistering 1 Gbps communication speed, this module integrates field devices, remote I/O, and other controllers into a seamless, high-speed Ethernet-based network. Optimized for data-intensive industries such as liquid crystal display (LCD) manufacturing, high-speed packaging, and complex food processing, the LJ71GF11-T2-CM provides the massive bandwidth required for real-time motion control and large-scale diagnostic data collection. By utilizing standard Category 5e (or higher) double-shielded cables, it offers a cost-effective yet industrial-grade solution for reducing network latency and maximizing total system throughput.

Technical Configuration

The LJ71GF11-T2-CM is a versatile communication hub that can be configured either as a "Master Station" to manage a network or as a "Local Station" to exchange data with other masters. It supports a staggering 16,384 points of remote I/O and 8,192 words of remote registers, allowing it to handle extremely complex field configurations without performance degradation.

The module features a 1 Gbps transmission rate using standard Ethernet physical layers (1000BASE-T). It supports flexible network topologies including line, star, and ring configurations. In a ring topology, the module provides enhanced reliability through a loop-back function, ensuring the network remains operational even if a single cable is disconnected. Note that this module requires a MELSEC-L CPU with a serial number prefix of "13012" or later to utilize its full high-speed functional range.

Technical Specifications

Feature Specification
Model LJ71GF11-T2-CM
Brand Mitsubishi Electric
Network Type CC-Link IE Field Network
Station Type Master or Local Station
Communication Speed 1 Gbps
Remote I/O Capacity 16,384 Points
Remote Register 8,192 Words
Network Topology Line, Star, Ring
Max. Stations 121 (including Master)
Internal Current (5 VDC) 0.89 A
Weight 0.27 kg
Dimensions 90 x 28.5 x 116.5 mm

Technical FAQs

Q1: What is the significance of the "CM" suffix in this model number?

A1: The "CM" suffix typically denotes the "Chinese Market" or specific regional compliance version, which may include localized documentation or specific environmental certifications while maintaining identical technical performance to the standard LJ71GF11-T2.

Q2: How do I implement a Ring Topology with this module?

A2: To utilize a ring topology, connect the cables in a continuous loop and configure the "Network Topology" setting to "Ring" within the GX Works2 parameter settings. This enables the loop-back function for redundant communication paths.

Q3: Why is my module not recognized by the L-Series CPU?

A3: Ensure your CPU's serial number starts with "13012" or later. Older CPU revisions do not have the internal bus logic required to communicate with the high-speed CC-Link IE Field hardware.


Engineering & Installation Guide

  • Cable Selection: Only use Category 5e or higher STP (Shielded Twisted Pair) cables that are specifically rated for 1000BASE-T. For industrial environments with high EMI (Electromagnetic Interference), double-shielded cables are highly recommended to prevent packet loss at 1 Gbps speeds.

  • Redundancy Planning: If using a star topology, the network requires an industrial-grade switching hub that supports 1 Gbps. For mission-critical applications, the ring topology is preferred as it eliminates the switching hub as a single point of failure.

  • Heat Dissipation: The LJ71GF11-T2-CM consumes 0.89 A of internal current, which is relatively high for an L-Series module. Ensure that the total current consumption of all modules on the branch does not exceed the power supply unit's (PSU) capacity, and maintain proper ventilation gaps in the control cabinet.

การจัดส่งด่วนทั่วโลก

  • การจัดส่งมาตรฐาน: 4-6 วันทำการ ผ่าน DHL, FedEx และ UPS
  • จัดส่งด่วน: จัดส่งในวันเดียวกันสำหรับคำสั่งซื้อที่มีในสต็อกและสั่งก่อนเวลา 14:00 น. (GMT+8)
  • ครอบคลุมทั่วโลก: ให้บริการมากกว่า 150 ประเทศ รวมถึงการจัดส่งด่วนไปยังซาอุดีอาระเบียและสหรัฐอาหรับเอมิเรตส์

การคืนสินค้าและการรับประกัน

  • การรับประกัน 30 วัน: รับคืนสินค้าที่มีในสต็อกในบรรจุภัณฑ์เดิมที่ปิดผนึกจากโรงงาน
  • การรับประกัน 12 เดือน: อะไหล่อุตสาหกรรมทุกชิ้นได้รับการรับประกันทางเทคนิคจากผู้เชี่ยวชาญของเรา

คำสั่งซื้อจะถูกดำเนินการและจัดส่งในวันจันทร์ถึงวันศุกร์ (ไม่รวมวันหยุดราชการ)


สำหรับคุณสมบัติครบถ้วน ค่าธรรมเนียมการเติมสินค้าใหม่ และรายละเอียดการคืนสินค้าระหว่างประเทศ กรุณาดูที่เว็บไซต์อย่างเป็นทางการของเรา นโยบายการคืนเงินและการคืนสินค้า .

TECHNICAL SPECIFICATIONS

Color pattern
สีขาวอมเทา
Country of origin
สหรัฐอเมริกา
Power source
ไฟฟ้ากระแสตรง

สินค้าที่ดูล่าสุด

ความรู้ทางเทคนิค

Electric Actuators Designed to Replace Fluid Power Systems: A Practical Industrial Automation Guide

This article explains how integrated electric actuators, such as SMC’s e-Actuator series, are transforming industrial motion control by replacing traditional pneumatic and hydraulic systems. It...

Math Operations Using OpenPLC for Industrial Automation Applications

This article explains how PLC systems perform core mathematical operations such as addition, subtraction, multiplication, division, modulo, and exponentiation within industrial automation. It shows...

Advanced Boolean Logic with FBD PLC Programming: Practical Industrial Applications Beyond Basic Logic

The article explains several advanced Boolean logic functions used in PLC programming beyond basic AND, OR, and NOT operations. It covers how tools like truth tables, multiplexers, pulse generators,...

Boolean Logic in PLC Programming: Understanding FBD Logic Gates

Boolean logic is the foundation of every PLC program. From simple machine controls to complex industrial automation systems, logic gates determine how controllers respond to changing inputs and...

Deep-Dive Guide to Industrial Firewalls and OT Network Segmentation

Industrial firewalls play a critical role in OT cybersecurity, protecting PLC, DCS, and SCADA networks through segmentation, ingress/egress control, and IDS/IPS integration aligned with IEC 62443...

Guide to Robotic Grippers: From Delicate Handling to Heavy-Duty Automation

Modern robotic grippers are evolving beyond traditional mechanical jaws. From gecko-inspired adhesive systems and soft food-grade grippers to AI-powered warehouse tools, advanced gripping...