1 de 1

Siemens 6ES7675-1DK30-2AL0 SIMATIC IPC427C Microbox PC Bundle

Siemens 6ES7675-1DK30-2AL0 SIMATIC IPC427C Microbox PC Bundle

Il ne reste que 3 article(s) en stock
  • Fabricant : Siemens

  • N° de produit : 6ES7675-1DK30-2AL0

  • Pays d'origine :Allemagne

  • Type de produit : Industrial PC

  • Code-barres : 85371091

  • Paiement : Virement bancaire, Western Union

  • Poids : 3400g

  • Dimensions : 18.5 cm x 18.5 cm x 15.0 cm

  • Port d'expédition : Xiamen

  • Garantie : 12 mois

Quantité
Voir les détails complets

Description

This is a Siemens 6ES7675-1DK30-2AL0, a pre-configured SIMATIC IPC427C Microbox PC bundle designed for demanding PC-based automation tasks. The unit is equipped with an Intel Core 2 Duo 1.2 GHz processor, 2 GB of DDR3 RAM, and a 50 GB high-endurance SATA Solid-State Drive (SSD) for reliable, fanless operation. It comes pre-installed with a comprehensive software package including Windows Embedded Standard 2009, the WinAC RTX 2010 software controller, and WinCC flexible 2008 RT for HMI applications. Connectivity is provided through one PROFIBUS DP port and two 1 Gbit/s Industrial Ethernet interfaces, making it suitable for integrated control and visualization solutions.

Features

  • Processor: Intel Core 2 Duo at 1.2 GHz with 800 MHz FSB
  • Memory: 2 GB DDR3 1066 SODIMM
  • Storage: 50 GB High-Endurance SATA Solid-State Drive (SSD)
  • Operating System: Windows Embedded Standard 2009 (Pre-installed)
  • Software Controller: WinAC RTX 2010
  • HMI Runtime: WinCC flexible 2008 RT (512 PowerTags)
  • Industrial Communication: 1x PROFIBUS DP, 2x Gigabit Industrial Ethernet
  • Compact, fanless Microbox design

Applications

  • PC-based machine control and automation
  • Human-Machine Interface (HMI) and SCADA applications
  • Data acquisition, logging, and processing at the machine level
  • Gateway and communication tasks in industrial networks
  • Process control and visualization in manufacturing

Technical Specifications

Category Specification
General
Part Number 6ES7675-1DK30-2AL0
Base Model SIMATIC IPC427C Microbox PC
Product Lifecycle Status Phase-Out
Hardware
Processor Intel Core 2 Duo, 1.2 GHz
Front Side Bus (FSB) 800 MHz
Memory 2 GB DDR3 1066, SODIMM
Storage 50 GB Solid-State Drive (SATA, High Endurance)
Software
Operating System Windows Embedded Standard 2009
Control Software WinAC RTX 2010
HMI Runtime WinCC flexible 2008 RT (512 PowerTags)
Interfaces
PROFIBUS 1x PROFIBUS DP
Ethernet 2x Industrial Ethernet (1 Gbit/s)
Logistics
Shipping Weight 3.40 kg
Package Dimensions (Calculated) 18.5 cm x 18.5 cm x 15.0 cm
Country of Origin (Estimate) Germany
Commodity Code 85371091
ECCN N

Installation Guidelines

CRITICAL WARNING: RISK OF ELECTRIC SHOCK AND EQUIPMENT DAMAGE

Installation must be performed by qualified personnel only. Disconnect all power sources and follow Lockout/Tagout (LOTO) procedures before accessing or installing this equipment. This device contains components sensitive to electrostatic discharge (ESD). Use proper ESD protection, including wrist straps and grounded mats, during handling and installation.

  1. 1 De-energize System: Before installation, ensure the control cabinet and all related power sources are completely de-energized, locked out, and tagged out to prevent accidental activation.
  2. 2 Mount the IPC: Securely mount the Microbox PC onto a standard DIN rail or a flat panel surface inside the control cabinet. Ensure adequate ventilation space around the unit as specified by the manufacturer for proper heat dissipation.
  3. 3 Establish Ground Connection: Connect the chassis grounding terminal to the main protective earth (PE) busbar of the control cabinet using a low-impedance conductor. A reliable ground connection is critical for safety and noise immunity.
  4. 4 Connect Communication Cables: Connect the PROFIBUS DP and Industrial Ethernet cables. Use appropriately shielded cables and ensure proper shield termination at one end to minimize electromagnetic interference (EMI). Route communication cables separately from high-voltage power lines.
  5. 5 Connect Power Supply: Connect the 24V DC power supply to the designated power input terminals. Verify the polarity is correct before applying power. Use appropriately sized wiring for the load.
  6. 6 System Power-Up: After verifying all connections, remove the lockout/tagout and re-energize the control cabinet. Monitor the IPC for correct boot-up sequence and status indicator activity.

Expédition express mondiale

  • Livraison standard : 4 à 6 jours ouvrables via DHL, FedEx et UPS.
  • Expédition express : Expédition le jour même pour les commandes en stock passées avant 14h00 (GMT+8).
  • Couverture mondiale : Service dans plus de 150 pays, avec livraison rapide en Arabie Saoudite et aux Émirats arabes unis.

Retours et garantie

  • Garantie de 30 jours : Retours acceptés pour les produits en stock dans leur emballage d’origine scellé en usine.
  • Garantie de 12 mois : Chaque composant industriel est couvert par notre garantie technique professionnelle.

Les commandes sont traitées et livrées du lundi au vendredi (hors jours fériés).


Pour connaître les conditions d’éligibilité complètes, les frais de restockage et les détails des retours internationaux, veuillez consulter notre site officiel Politique de remboursement et de retour .

TECHNICAL SPECIFICATIONS

Country of origin
Allemagne

Produits récemment consultés

Connaissances techniques

Logique booléenne en programmation PLC : comprendre les portes logiques FBD

La logique booléenne est la base de tout programme PLC. Des commandes machines simples aux systèmes d'automatisation industrielle complexes, les portes logiques déterminent comment les contrôleurs...

Guide approfondi sur les pare-feux industriels et la segmentation des réseaux OT

Les pare-feux industriels jouent un rôle crucial dans la cybersécurité OT, protégeant les réseaux PLC, DCS et SCADA grâce à la segmentation, au contrôle des entrées/sorties et à l'intégration IDS/IPS...

Guide des préhenseurs robotiques : de la manipulation délicate à l'automatisation lourde

Les pinces robotiques modernes évoluent au-delà des mâchoires mécaniques traditionnelles. Des systèmes adhésifs inspirés du gecko et des pinces souples de qualité alimentaire aux outils d'entrepôt...

Retour en arrière : comment les premiers moteurs électriques ont transformé l'exploitation minière souterraine

Des compresseurs à courant continu entraînés par corde aux wagonnets de mine alimentés par batterie, les premières opérations minières ont marqué un tournant dans l’électrification industrielle. Cet...

Factory I/O : un outil moderne de simulation PLC pour la formation à l'automatisation industrielle

Factory I/O révolutionne l'enseignement des automates programmables industriels (API) en proposant des simulations industrielles 3D immersives pour les étudiants, les ingénieurs et les équipes de...

Programmation des cycles de mouvement à axe unique sur un servo-variateur CMZ

Ce tutoriel examine comment la fonctionnalité PLC intégrée dans un servo-variateur CMZ SBD peut exécuter des programmes de mouvement autonomes, y compris la logique de référencement, le contrôle de...