General Electric

General Electric IS210MACCH2AEG Mark VI Mark VIe Multi Application Converter Controller Board

SKU IS210MACCH2AEG

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: General Electric

  • Product No.: IS210MACCH2AEG

  • Country of origin:United States

  • Product Type: PCB Board

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 650g

  • Dimensions: 22.0 cm x 15.0 cm x 3.0 cm (W x H x D)

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The IS210MACCH2AEG is a Multi Application Converter Controller (MACC) printed circuit board designed by the GE Energy division. This control card operates as a core control and communication module integrated within GE Mark VI and Mark VIe turbine control systems and Distributed Control Systems (DCS). It is primarily utilized in the inverter and converter control systems of 1.5 megawatt (1.5MW) wind turbines. The board features an onboard high-performance microprocessor configured for high-precision analog and digital signal acquisition, along with integrated signal isolation and filtering circuitry to execute complex control algorithms. It is designed to withstand extreme industrial environments, offering wide temperature tolerance and robust communication capability across multiple standard industrial networks.

Features

  • Functions as a Multi Application Converter Controller (MACC) for precision control, signal conversion, and real-time data processing.
  • Features integrated signal isolation and filtering circuitry to protect control loops from noise.
  • Provides full compatibility with the Mark VIe Triple Modular Redundant (TMR) architecture for data voting and fault detection.
  • Supports high-precision digital and analog input/output signal processing.
  • Equipped with integrated communication interfaces for broad network connectivity.

Applications

  • 1.5MW wind turbine inverter and converter control systems
  • Wind turbine power distribution cabinets
  • Thermal and hydro power plant control systems
  • Distributed Control Systems (DCS) and turbine synchronization

Technical Specifications

Parameter Value
Manufacturer General Electric (GE Energy)
Model IS210MACCH2AEG
Series Mark VI / Mark VIe
Module Type Multi Application Converter Controller (MACC) Board
Operating Temperature -40 to +85 Celsius
Supported Protocols Ethernet, Modbus, Profibus, RS232
Architecture Compatibility Triple Modular Redundant (TMR) Data Voting

 

Installation Guidelines

  • Ensure the system is powered down completely before inserting the controller board into its designated backplane slot.
  • Implement standard grounding and shielding procedures for all connected communication lines to mitigate EMI/RFI interference.
  • Verify that the physical orientation matches the guide rails of the cabinet enclosure to prevent pin damage during insertion.
  • Ensure adequate ventilation within the distribution cabinet to maintain the specified operating temperature range under continuous load.

FAQ

What does the MACC abbreviation represent on this control board?

MACC stands for Multi Application Converter Controller, which specifies the device's role in handling high-precision control, signal conversion, and real-time data processing within power generation systems.

What industrial communication protocols are natively supported by the device?

The communication module integrates multiple standard interfaces, providing native support for Ethernet, Modbus, Profibus, and RS232 protocols to interface with other subsystems.

Is the controller board compatible with fault-tolerant system designs?

Yes, the board is fully compatible with the Mark VIe Triple Modular Redundant (TMR) architecture, allowing direct interconnection for data voting and zero-blind-spot fault detection.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 8 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Green
Country of origin
United States

Technical knowledge

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.

ABB PM891K01 Replacement: Check Redundancy Before Ordering

ABB PM891K01 article 3BSE053241R1 is the non-redundant AC 800M processor kit. Use this field checklist before replacement.

ABB TP853 Replacement Checks for CI853/CI855/CI857/CI861

Replacement checks for ABB TP853 3BSE018126R1: identify the installed CI853, CI855, CI857, or CI861 interface, record wiring, and verify communication after installation.

5069-L330ERMS2 Startup Checks: RTBs, I/O, and Motion Limits

Engineering checks for the Allen-Bradley 5069-L330ERMS2: controller capacity, separate RTB kits, local I/O limits, network-node limits, and motion-axis count.

Replacing ABB DSQC 351: Controller and Network Checks

Checks to record before replacing ABB 3HNE 00006-1 DSQC 351: controller generation, X3/X5/X20/X21 wiring, DeviceNet settings, INTERBUS mapping, and LED states.