Honeywell

Honeywell 51196694-928 Trackball PS/2 Upgrade Board

SKU 51196694-928

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Honeywell

  • Product No.: 51196694-928

  • Country of origin:United States

  • Product Type: Trackball PS/2 Upgrade Boards

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 40g

  • Dimensions: 10.8cm x 6.2cm x 1.3cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Honeywell 51196694-928 is an official trackball PS/2 upgrade board designed for integration within Honeywell Experion PKS distributed control system (DCS) environments. This hardware component provides a reliable replacement or upgrade path for operator console interface peripherals, ensuring seamless communication and precise cursor control within demanding industrial control room applications.

Engineered for continuous operation in mission-critical environments, the upgrade board interfaces directly with standard operator station architecture. It maintains high reliability and signal integrity for legacy PS/2 peripheral connections used across industrial automation and process control networks.

Features

  • Authentic Honeywell Experion PKS system component
  • Designed for standard PS/2 trackball interface integration
  • Direct replacement for legacy operator station upgrade boards
  • Built to industrial reliability standards for continuous control room service

Applications

  • Honeywell Experion PKS operator consoles
  • Industrial control rooms and SCADA monitoring stations
  • Process manufacturing and DCS human-machine interface upgrades

Technical Specifications

Parameter Specification
Manufacturer Honeywell
Exact Model 51196694-928
Product Type Trackball PS/2 Upgrade Board
Product Family Experion PKS
System Environment Distributed Control System (DCS)
Interface Type PS/2
Country of Origin United States
Dimensions 10.8 x 6.2 x 1.3 cm
Net Weight 0.04 kg

Installation Guidelines

  1. Verify that the control station power is completely de-energized before performing any hardware maintenance.
  2. Inspect the upgrade board and packaging for any signs of transit damage.
  3. Open the operator console housing and locate the existing trackball interface or mounting location.
  4. Securely mount the 51196694-928 board and connect the PS/2 interface cabling according to the console wiring diagram.
  5. Close the enclosure, restore power, and verify proper trackball response within the Experion PKS operator environment.

FAQ

What system environments are compatible with the Honeywell 51196694-928 Trackball PS/2 Upgrade Board?

The Honeywell 51196694-928 trackball PS/2 upgrade board is specifically designed for integration within Honeywell Experion PKS distributed control system (DCS) environments. It serves as an authentic component for operator console interfaces found in industrial control rooms and process manufacturing facilities. This ensures seamless communication and precise cursor control for legacy operator station architectures.

What type of peripheral interface does this upgrade board support?

The Honeywell 51196694-928 upgrade board utilizes a standard PS/2 interface to connect trackball peripherals within industrial automation networks. This interface type maintains high reliability and signal integrity for legacy operator station hardware. It provides a direct replacement path for older console interface boards without requiring network protocol modifications.

What are the physical dimensions and weight of the Honeywell 51196694-928 board?

The Honeywell 51196694-928 trackball PS/2 upgrade board measures 10.8 x 6.2 x 1.3 cm, making it a compact internal hardware component. It features a lightweight design with a net weight of approximately 0.04 kg. These precise dimensions allow for straightforward retrofitting inside standard Honeywell operator console housings.

What safety precautions are required when installing the Honeywell 51196694-928?

During the installation of the Honeywell 51196694-928 trackball PS/2 upgrade board, technicians must verify that the control station power is completely de-energized. After opening the operator console housing, users should secure the mounting board and connect the PS/2 cabling according to the wiring diagram. Finally, the enclosure is closed and power is restored to verify proper trackball response within the Experion PKS environment.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 3 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
United States

Technical knowledge

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.

ABB PM891K01 Replacement: Check Redundancy Before Ordering

ABB PM891K01 article 3BSE053241R1 is the non-redundant AC 800M processor kit. Use this field checklist before replacement.

ABB TP853 Replacement Checks for CI853/CI855/CI857/CI861

Replacement checks for ABB TP853 3BSE018126R1: identify the installed CI853, CI855, CI857, or CI861 interface, record wiring, and verify communication after installation.

5069-L330ERMS2 Startup Checks: RTBs, I/O, and Motion Limits

Engineering checks for the Allen-Bradley 5069-L330ERMS2: controller capacity, separate RTB kits, local I/O limits, network-node limits, and motion-axis count.

Replacing ABB DSQC 351: Controller and Network Checks

Checks to record before replacing ABB 3HNE 00006-1 DSQC 351: controller generation, X3/X5/X20/X21 wiring, DeviceNet settings, INTERBUS mapping, and LED states.

IC693CPU360 vs IC693CPU364: Ethernet and Power Budget

Compare the IC693CPU360 and IC693CPU364 by Ethernet interface, +5 VDC load, memory, rack limits, and replacement checks.