1 of 1

CJ2M-CPU34 | Omron | Unités CPU CJ2M (EtherNet/IP intégré)

CJ2M-CPU34 | Omron | Unités CPU CJ2M (EtherNet/IP intégré)

Il ne reste que 2 article(s) en stock
  • Fabricant : Omron

  • N° de produit : CJ2M-CPU34

  • Pays d'origine :Japon

  • Type de produit : Unités CPU CJ2M (EtherNet/IP intégré)

  • Paiement : Virement bancaire, Western Union

  • Poids : 190g

  • Dimensions : 90 mm x 75 mm x 62 mm

  • Port d'expédition : Xiamen

  • Garantie : 12 mois

Quantité
Voir les détails complets

Description

To deliver high-speed logic execution and integrated factory network communications, the Omron CJ2M-CPU34 functions as a core processing module within the modular CJ2M Series PLC architecture. Engineered for high-speed industrial automation, this CPU supports 30K steps of program memory and up to 160K words of data memory. It features an integrated EtherNet/IP port alongside a dedicated USB programming port, eliminating the need for specialized external communication adapters. Its exceptionally fast 0.04 us LD instruction execution speed makes it highly suitable for demanding motion, packaging, and process sequencing tasks.

Key Features

  • High-Speed Processing: Logic execution speed of 0.04 us for basic instructions and 0.06 us for double-precision instructions.
  • Integrated Communication: Built-in EtherNet/IP port for seamless tag data links, message communications, and FINS TCP/IP connections.
  • Expandable Architecture: Supports up to 2,560 local digital I/O points and up to 40 I/O modules across 3 expansion racks.
  • Flexible Memory Allocations: 30K steps program capacity and 160K words of data memory, featuring DM and multiple EM banks.
  • Direct Programming Access: Standard high-speed USB 2.0 peripheral port on the front panel for rapid software monitoring and updates.

Applications

  • Packaging and Labeling: Synchronized operations with multi-station control and high-speed registration.
  • Material Handling: Distributed sorting conveyor networks, automated storage and retrieval systems (AS/RS).
  • Assembly and Testing: Precision electronic assembly machines, pick-and-place stations, and diagnostic instrumentation.
  • Process Control Integration: Remote telemetry, environmental monitoring, and factory-wide SCADA data aggregation.

Technical Specifications

Manufacturer Omron
Model CJ2M-CPU34
Series CJ2M (Built-in EtherNet/IP) CPU Units
Program Capacity 30K steps
Data Memory Capacity 160K words (DM: 32K words, EM: 32K words x 4 banks)
LD Instruction Execution Time 0.04 us
Max Local I/O Points 2,560 points
Mountable Units (Expansion Racks) 40 Units (Maximum 3 Expansion Racks)
Current Consumption (5 VDC) 0.7 A
Interfaces EtherNet/IP (RJ45), USB (Type-B), Option Board Slot
CPU Unit Dimensions 90 mm x 75 mm x 62 mm
Weight 0.19 kg
Shipping Weight (Calculated) 1.50 kg

Connections and Interfaces

Port / Connector Function / Cable Specification
EtherNet/IP Port RJ45, 100Base-TX/10Base-T. Supports Tag Data Links, FINS messages, and FTP server functions.
USB Port USB 2.0 Type-B connection. High-speed engineering connection for CX-Programmer upload/download.
Serial Option Slot Accepts optional RS-232C (CP1W-CIF01) or RS-422A/485 (CP1W-CIF11/CIF12-V1) serial option boards.

Empirical Engineering Insights

Alternative Models & Compatibility

The CJ2M-CPU34 is a direct fit-form-function replacement for legacy CJ1M-series installations, offering greater execution speed and native EtherNet/IP capabilities. Programs from CJ1M platforms can be systematically imported using CX-Programmer, though variables allocated to specific legacy registers should be verified against the extended EM banks of the CJ2M.

Application Pitfalls & Engineering Notes

While the integrated EtherNet/IP port supports heavy traffic, the internal processor prioritizes logic execution over network task allocation. High tag data link rates (over 3200 PPS cumulative) can lead to microsecond fluctuations in task cycle times. If high cyclic network throughput is expected alongside intense floating-point math, segmenting communications onto a dedicated CJ1W-EIP21 module is highly recommended.

Commissioning & Wiring Tips

The node address of the integrated EtherNet/IP interface is assigned via physical rotary switches located on the front panel of the CPU. If the IP address does not resolve, check that these hardware switch settings correspond directly to the host portion of the network IP configuration. Always run Ethernet cables distinct from high-voltage AC motor lines to avoid physical layer noise disruption.

Installation Guidelines

CRITICAL WARNING: De-energize all primary and secondary power distribution systems connected to the CJ-series backplane before inserting or removing the CPU unit. Working on energized backplanes can cause memory corruption, damage internal components, or lead to unexpected plant machinery operation.
1
Align the hooks on the back of the CPU unit with the DIN rail structure and carefully slide the module into position next to the power supply unit.
2
Engage the yellow slider locking clips on both the top and bottom of the unit to lock the assembly firmly to the adjacent modules on the rack.
3
Secure the end plate at the final slot of the assembly to prevent physical lateral drift along the DIN rail.
4
Connect the shielded Ethernet cable (Cat5e or Cat6) to the RJ45 jack and verify the network indicator lamps light up on power-up initialization.
Loading product navigation…

What is the maximum Tag Data Link capacity for the CJ2M-CPU34 built-in EtherNet/IP port?

The built-in EtherNet/IP port on the CJ2M-CPU34 supports up to 3200 PPS (packets per second) for cyclic communication. The maximum number of connection links is 32.

Can I program the CJ2M-CPU34 without a dedicated programming cable?

Yes, the CJ2M-CPU34 features a built-in peripheral USB port (Type-B) that allows direct programming and monitoring via a standard USB-A to USB-B cable using CX-Programmer.

How do I configure the FINS node address for EtherNet/IP communications?

The FINS node address is set via the rotary switches on the front panel of the CPU unit. Ensure the rotary switch value aligns with the host IP address configuration for proper routing.

Expédition express mondiale

  • Livraison standard : 4 à 6 jours ouvrables via DHL, FedEx et UPS.
  • Expédition express : Expédition le jour même pour les commandes en stock passées avant 14h00 (GMT+8).
  • Couverture mondiale : Service dans plus de 150 pays, avec livraison rapide en Arabie Saoudite et aux Émirats arabes unis.

Retours et garantie

  • Garantie de 30 jours : Retours acceptés pour les produits en stock dans leur emballage d'origine scellé en usine.
  • Garantie de 12 mois : Chaque composant industriel est couvert par notre garantie technique professionnelle.

Les commandes sont traitées et livrées du lundi au vendredi (hors jours fériés).


Pour connaître l'éligibilité complète, les frais de restockage et les détails des retours internationaux, veuillez consulter notre site officiel Politique de remboursement et de retour .

TECHNICAL SPECIFICATIONS

Country of origin
Japon

Produits récemment consultés

Connaissances techniques

Opérations mathématiques avec OpenPLC pour les applications d'automatisation industrielle

Cet article explique comment les systèmes PLC réalisent des opérations mathématiques de base telles que l'addition, la soustraction, la multiplication, la division, le modulo et l'exponentiation dans...

Logique booléenne avancée avec la programmation FBD PLC : applications industrielles pratiques au-delà de la logique de base

L'article explique plusieurs fonctions avancées de la logique booléenne utilisées en programmation d'automates programmables industriels (API) au-delà des opérations de base ET, OU et NON. Il aborde...

Logique booléenne en programmation PLC : comprendre les portes logiques FBD

La logique booléenne est la base de tout programme PLC. Des commandes machines simples aux systèmes d'automatisation industrielle complexes, les portes logiques déterminent comment les contrôleurs...

Guide approfondi sur les pare-feux industriels et la segmentation des réseaux OT

Les pare-feux industriels jouent un rôle crucial dans la cybersécurité OT, protégeant les réseaux PLC, DCS et SCADA grâce à la segmentation, au contrôle des entrées/sorties et à l’intégration IDS/IPS...

Guide des pinces robotiques : de la manipulation délicate à l'automatisation lourde

Les pinces robotiques modernes évoluent au-delà des mâchoires mécaniques traditionnelles. Des systèmes adhésifs inspirés des geckos aux pinces souples de qualité alimentaire, en passant par des...

Retour en arrière : comment les premiers moteurs électriques ont transformé l'exploitation minière souterraine

Des compresseurs à courant continu entraînés par corde aux wagonnets de mine alimentés par batterie, les premières opérations minières ont marqué un tournant dans l’électrification industrielle. Cet...