1 / 1

Mitsubishi Electric LJ72GF15-T2-CM MELSEC L Series CC-Link IE Field Head Module

Mitsubishi Electric LJ72GF15-T2-CM MELSEC L Series CC-Link IE Field Head Module

Only 10 item(s) left in stock
  • Manufacturer: Mitsubishi Electric

  • Product No.: LJ72GF15-T2-CM

  • Country of origin:Egyesült Államok

  • Product Type: PLC Network Modules

  • Payment: T/T, Western Union

  • Weight: 2000g

  • Shipping port: Xiamen

  • Warranty: 12 months

Mennyiség
Minden részlet megtekintése

Description

Establishing reliable, deterministic remote node connectivity within distributed automation architectures, the Mitsubishi Electric LJ72GF15-T2-CM operates as a high-performance CC-Link IE Field Network Head Module. This intelligent device station links decentralized digital and analog I/O modules directly to a master controller over a high-speed Ethernet backbone. Engineered for the MELSEC L Series platform, it supports complex modular topologies while maintaining rapid response times and extensive diagnostics across the industrial network.

Features

  • High-Speed Transmission: Supports 1 Gbps communication speeds over standard industrial Ethernet media for near-zero latency cyclic data exchange.
  • Extensive Node Capacity: Manages up to 2048 remote I/O points and 1024 words of remote register data per station.
  • Integrated RAS Functions: Features built-in Reliability, Availability, and Serviceability diagnostics to pinpoint network faults instantly.
  • System Completeness: Supplied standard with the required END bus cover to ensure correct backplane termination.
  • Modular Expandability: Allows direct attachment of standard MELSEC L Series digital, analog, and specialty function modules.

Applications

  • Automotive assembly lines requiring high-speed distributed I/O control.
  • Packaging and material handling systems with remote conveyor nodes.
  • Water treatment facilities utilizing scattered instrumentation stations.
  • Multi-zone thermal control processes and remote telemetry panels.

Technical Specifications

Parameter Specification
Manufacturer Mitsubishi Electric
Model Number LJ72GF15-T2-CM
Product Series MELSEC L Series
Station Type CC-Link IE Field Intelligent Device Station
Communication Speed 1 Gbps
Max. Remote I/O Points 2048 points
Max. Remote Register Capacity 1024 words
Internal Current Consumption (5V DC) 1.00 A
RAS Functions Supported (Hardware diagnostics, loopback tests, link status tracking)
Included Accessories END cover termination unit
Net Weight 0.23 kg
Shipping Weight (Calculated) 2.00 kg

Connections and Interfaces

Interface Port Connection & Cable Type Function Description
PORT 1 / PORT 2 RJ45 Connector (Cat5e or higher STP, double-shielded) CC-Link IE Field Network Line connection (supports line, star, and ring topologies)
Station No. Switches Rotary hardware switches (x1, x10) Manual network station address configuration (1 to 120)

Empirical Engineering Insights

Alternative Models & Compatibility

The "-CM" suffix indicates compliance and localized packaging standards, but functionally mirrors the standard LJ72GF15-T2. It is fully cross-compatible with standard MELSEC L Series power supply modules, digital I/O, and analog modules. Ensure your engineering environment is updated with the correct CSP+ profiles in GX Works2 or GX Works3 to correctly discover the device station during network configuration.

Application Pitfalls & Engineering Notes

A common field failure involves network dropouts caused by electromagnetic interference (EMI). Because CC-Link IE Field operates at 1 Gbps, standard unshielded Cat5 cable is highly susceptible to variable frequency drive (VFD) noise. Double-shielded (STP) Category 5e or Category 6 cables with grounded metal RJ45 shells must be used. Additionally, compute the total 5V DC backplane current consumption: if adding high-density modules exceeds the power supply module's capacity, the head module will shut down or experience intermittent communications.

Commissioning & Wiring Tips

The head module will fail to boot and display a hardware bus error if the physical END cover is not securely locked onto the rightmost slot of the overall assembly. Always perform a physical latch-check before powering up. When setting the station number using the rotary dials, make sure to cycle the main system power; the module only reads the rotary switch state during the initial hardware initialization phase.

Installation Guidelines

CRITICAL WARNING: Before installing, removing, or wiring any module in the assembly, ensure the main external power source is completely disconnected on all phases. Failure to do so can result in electrical shock, backplane bus damage, or immediate hardware failure.
1

Mount the head module onto the DIN rail, ensuring the unit's DIN rail hooks are securely engaged and locked.

2

Align the side joint connectors of the adjacent power supply and I/O modules, sliding them together until they click into place, then engage the module joint levers.

3

Affix the supplied END cover onto the rightmost module slot of the completed rack assembly.

4

Set the station number on the front-panel rotary switches using a small precision screwdriver, and connect the double-shielded Ethernet cables to PORT 1 or PORT 2.

What is the function of the included END cover on the LJ72GF15-T2-CM?

The END cover terminates the internal backplane bus of the MELSEC L Series system. Without this cover physically attached to the right side of the module stack, the system will detect an incomplete bus connection and generate a hardware error, halting all operations.

Can I use standard CAT5 UTP patch cables for this CC-Link IE Field module?

It is highly discouraged. Because CC-Link IE Field operates at 1 Gbps, it requires double-shielded (STP) Category 5e or Category 6 industrial Ethernet cabling with grounded metal connectors to prevent packet loss due to electromagnetic noise.

How do I configure the station number on this network head module?

The station number is configured using the two rotary switches on the front of the module. Turn the dials to your desired address (from 1 to 120) before powering up. Power must be cycled for the module to register changes to these switches.

Does this module support both line and ring network topologies?

Yes. The dual RJ45 ports (PORT 1 and PORT 2) support line, star, and redundant ring topologies within the CC-Link IE Field network framework.

Globális expressz szállítás

  • Normál szállítás: 4-6 munkanap a DHL, FedEx és UPS szolgáltatásával.
  • Gyors kiszállítás: A raktáron lévő, 14:00 (GMT+8) előtt leadott megrendeléseket aznap feladjuk.
  • Világszintű lefedettség: Több mint 150 országban szolgálunk ki, beleértve a gyors szállítást Szaúd-Arábiába és az Egyesült Arab Emírségekbe.

Visszaküldés és garancia

  • 30 napos garancia: Csak a raktáron lévő termékek eredeti, gyári zárt csomagolásban történő visszaküldését fogadjuk el.
  • 12 hónapos garancia: Minden ipari alkatrészünket szakmai műszaki garancia védi.

A megrendeléseket hétfőtől péntekig dolgozzuk fel és szállítjuk (állami ünnepnapok kivételével).


A teljes jogosultság, a készletfeltöltési díjak és a nemzetközi visszaküldési részletek megtekintéséhez kérjük, tekintse meg hivatalos oldalunkat Visszatérítési és Visszaküldési Szabályzat .

TECHNICAL SPECIFICATIONS

Country of origin
Egyesült Államok

Nemrég megtekintett termékek

Műszaki ismeretek

Elektromos működtetők, amelyek a folyadékenergia-rendszereket váltják ki: Gyakorlati ipari automatizálási útmutató

Ez a cikk bemutatja, hogyan alakítják át az integrált elektromos működtetők, például az SMC e-Actuator sorozata, az ipari mozgásvezérlést azáltal, hogy kiváltják a hagyományos pneumatikus és...

Matematikai műveletek OpenPLC-vel ipari automatizálási alkalmazásokhoz

Ez a cikk bemutatja, hogyan hajtanak végre a PLC rendszerek alapvető matematikai műveleteket, mint az összeadás, kivonás, szorzás, osztás, modulo és hatványozás az ipari automatizálásban. Megmutatja,...

Fejlett Boole-logika FBD PLC programozással: Gyakorlati ipari alkalmazások a alapvető logikán túl

A cikk több fejlett Boole-logikai függvényt ismertet, amelyeket a PLC programozásban használnak az alapvető ÉS, VAGY és NEM műveleteken túl. Bemutatja, hogyan alkalmazhatók olyan eszközök, mint az...

Boole-logika a PLC programozásban: Az FBD logikai kapuk megértése

A Boole-logika minden PLC program alapja. Az egyszerű gépvezérlésektől a bonyolult ipari automatizálási rendszerekig a logikai kapuk határozzák meg, hogyan reagálnak a vezérlők a változó bemenetekre...

Részletes útmutató az ipari tűzfalakról és az OT hálózati szegmentációról

Az ipari tűzfalak kulcsfontosságú szerepet játszanak az OT kiberbiztonságban, védve a PLC, DCS és SCADA hálózatokat szegmentálás, be- és kimeneti forgalom szabályozás, valamint az IEC 62443 elveivel...

Útmutató a robotikus fogókhoz: a finomkezeléstől a nehézüzemi automatizálásig

A modern robotfogók túlmutatnak a hagyományos mechanikus állkapcsokon. A gyíkok tapadó rendszerétől és az élelmiszeripari puha fogóktól az MI-vezérelt raktári eszközökig a fejlett fogástechnológiák...