1 of 1

QJ71GF11-T2 | Mitsubishi Electric | Module maître CC-Link IE Field

QJ71GF11-T2 | Mitsubishi Electric | Module maître CC-Link IE Field

Il ne reste que 10 article(s) en stock
  • Fabricant : Mitsubishi Electric

  • N° de produit : QJ71GF11-T2

  • Pays d'origine :États-Unis

  • Type de produit : Module maître CC-Link IE Field

  • Paiement : Virement bancaire, Western Union

  • Poids : 180g

  • Dimensions : 27.4 mm x 98 mm x 115 mm

  • Port d'expédition : Xiamen

  • Garantie : 12 mois

Quantité
Voir les détails complets

Description

Integrating seamlessly into high-speed industrial networks, the QJ71GF11-T2 serves as a high-performance communication interface within the MELSEC-Q automation platform. This module enables deterministic, high-capacity data exchange by functioning as either a master or local station on a CC-Link IE Field network. Operating at a transmission speed of 1 Gbps, it manages extensive digital and analog I/O points across distributed automation architectures, ensuring synchronized control and rapid diagnostic capabilities.

The unit supports versatile physical layouts including line, star, and ring network topologies, which can be combined to suit complex factory floor environments. Its integration within the MELSEC-Q series allows for straightforward configuration via GX Works software, reducing engineering overhead and optimizing data throughput for heavy industrial processing.

Features

  • High-Speed Communication: Operates at a physical layer speed of 1 Gbps for rapid data transmission.
  • Flexible Topologies: Supports line, star, and ring network configurations, including hybrid line/star systems.
  • Dual-Role Capability: Configurable as either a network Master Station or a Local Station.
  • Token Passing Method: Implements a deterministic token-passing communication scheme to prevent network collisions.
  • Massive Data Capacity: Handles up to 16,384 RX/RY points and 8,192 RWr/RWw words per network.
  • Extended Distances: Supports up to 100 meters between stations and up to 12,100 meters total loop distance in ring configurations.

Applications

  • Automotive assembly and robotic welding lines
  • High-speed packaging and sorting machinery
  • Water and wastewater treatment distribution systems
  • Material handling and automated warehousing systems
  • Distributed PLC-to-PLC communication links in processing plants

Technical Specifications

Manufacturer Mitsubishi Electric
Part Number / Model QJ71GF11-T2
Module Type CC-Link IE Field Network Master/Local Module
Communication Speed 1 Gbps
Station Types Master Station, Local Station
Communication Method Token passing method
Maximum RX Points 16,384 points
Maximum RY Points 16,384 points
Maximum RWr Points 8,192 points
Maximum RWw Points 8,192 points
Connection Cable Type Category 5e or higher (Double-shielded, STP) straight cable
Max Station-to-Station Distance 100 m (Compliant with ANSI/TIA/EIA-568-B Category 5e)
Max Total Distance (Line) 12,000 m (1 master and 120 slave stations)
Max Total Distance (Ring) 12,100 m (1 master and 120 slave stations)
Occupied I/O Points 32 points (I/O assignment: Intelligent 32 points)
Internal Current Consumption (5 VDC) 0.85 A
Dimensions (W x H x D) 27.4 mm x 98 mm x 115 mm
Weight 0.18 kg

Connections and Interfaces

Port Label Connector Type Functional Description
PORT1 RJ45 Primary CC-Link IE Field connection port (1000BASE-T)
PORT2 RJ45 Secondary CC-Link IE Field connection port for ring, line, or star daisy-chaining

Installation Guidelines

  • Mounting: Place the module into the standard slot of a MELSEC-Q series main or extension base unit. Secure the unit with the module fixing screw to prevent vibration-induced disconnections.
  • Cabling Requirements: Use only double-shielded, Category 5e or higher STP straight cables. Standard unshielded twisted pair (UTP) cables should not be used due to noise sensitivity at 1 Gbps speeds.
  • Noise Abatement: Route communication cables away from high-voltage cables and motor drive lines by a minimum of 100 mm to avoid electromagnetic interference.
  • Grounding: Ensure the base unit's functional ground (FG) terminal is connected to a dedicated class D ground (grounding resistance of 100 ohms or less).
Loading product navigation…

Can the QJ71GF11-T2 module be used in a CC-Link IE Control network?

No. The QJ71GF11-T2 is designed specifically for CC-Link IE Field networks and is not compatible with CC-Link IE Control networks.

Does this module support star topologies, and are hubs required?

Yes, star topologies are supported. When building a star topology, a compatible industrial switching hub (1000BASE-T compliant) is required.

What happens if a cable breaks in a ring topology setup?

In a ring topology configuration, the network will automatically perform a loopback function to keep communication active among the remaining operational stations.

How many I/O points does the QJ71GF11-T2 occupy on the PLC base unit?

The module occupies 32 points, configured as an Intelligent module within the PLC I/O assignment settings.

Expédition express mondiale

  • Livraison standard : 4 à 6 jours ouvrables via DHL, FedEx et UPS.
  • Expédition express : Expédition le jour même pour les commandes en stock passées avant 14h00 (GMT+8).
  • Couverture mondiale : Service dans plus de 150 pays, avec livraison rapide en Arabie Saoudite et aux Émirats arabes unis.

Retours et garantie

  • Garantie de 30 jours : Retours acceptés pour les produits en stock dans leur emballage d'origine scellé en usine.
  • Garantie de 12 mois : Chaque composant industriel est couvert par notre garantie technique professionnelle.

Les commandes sont traitées et livrées du lundi au vendredi (hors jours fériés).


Pour connaître l'éligibilité complète, les frais de restockage et les détails des retours internationaux, veuillez consulter notre site officiel Politique de remboursement et de retour .

TECHNICAL SPECIFICATIONS

Country of origin
États-Unis

Produits récemment consultés

Connaissances techniques

Actionneurs électriques conçus pour remplacer les systèmes à fluide : un guide pratique d'automatisation industrielle

Cet article explique comment les actionneurs électriques intégrés, tels que la série e-Actuator de SMC, transforment le contrôle du mouvement industriel en remplaçant les systèmes pneumatiques et...

Opérations mathématiques avec OpenPLC pour les applications d'automatisation industrielle

Cet article explique comment les systèmes PLC réalisent des opérations mathématiques de base telles que l'addition, la soustraction, la multiplication, la division, le modulo et l'exponentiation dans...

Logique booléenne avancée avec la programmation FBD PLC : applications industrielles pratiques au-delà de la logique de base

L'article explique plusieurs fonctions avancées de la logique booléenne utilisées en programmation d'automates programmables industriels (API) au-delà des opérations de base ET, OU et NON. Il aborde...

Logique booléenne en programmation PLC : comprendre les portes logiques FBD

La logique booléenne est la base de tout programme PLC. Des commandes machines simples aux systèmes d'automatisation industrielle complexes, les portes logiques déterminent comment les contrôleurs...

Guide approfondi sur les pare-feux industriels et la segmentation des réseaux OT

Les pare-feux industriels jouent un rôle crucial dans la cybersécurité OT, protégeant les réseaux PLC, DCS et SCADA grâce à la segmentation, au contrôle des entrées/sorties et à l’intégration IDS/IPS...

Guide des pinces robotiques : de la manipulation délicate à l'automatisation lourde

Les pinces robotiques modernes évoluent au-delà des mâchoires mécaniques traditionnelles. Des systèmes adhésifs inspirés des geckos aux pinces souples de qualité alimentaire, en passant par des...